Oxford plasma cutter best online shopping: What factors should you consider when determining a budget? You may already have an estimated budget in mind. The type of welder you purchase should be suited for the specific functions you require as well as the projects you will work on the most. Think about your end goal and consider opportunities to expand the usefulness of your welder. Will you want more power or amperage in the future? It is important to take note of the varying amperage and power requirements as well as the duty cycle necessary to achieve the most effective and economical operational results for the projects you’re looking to complete. In addition to the cost of the welder itself, don’t forget to include costs for the accessories and supplies you’ll need to operate your new welder. This includes welding protection (helmet, gloves, jacket, etc.) as well as gas and consumables.
To us solid build & rugged reliability & long lifespan is just as important as welding performance! By designing our machines to be very electrically efficient we achieve performance levels much higher than other machines on the market, for example 400A + MIG welding on 230V single phase, Plasma cutting up to 36mm steel on 230V single phase, etc. Our OXFORD range now extends to around 50 different models & includes MIG, TIG, PLASMA, PULSE MIG & multi-process machines with ARC (MMA) MIG & TIG functions. Despite the ever increasing amount of low cost cheap imports available, our sales continue to grow year on year & we now have a good share of the UK market with additional export business. Explore additional info at Oxford Welders.
For the best control of your weld bead, keep the wire directed at the leading edge of the weld pool. When welding out of position (vertical, horizontal or overhead welding), keep the weld pool small for best weld bead control, and use the smallest wire diameter size you can. A bead that is too tall and skinny indicates a lack of heat into the weld joint or too fast of travel speed. Conversely, if the bead is flat and wide, the weld parameters are too hot or you are welding too slowly. Ideally, the weld should have a slight crown that just touches the metal around it. Keep in mind that a push technique preheats the metal, which means this is best used with thinner metals like aluminum. On the other hand, if you pull solid wire, it flattens the weld out and puts a lot of heat into the metal. Finally, always store and handle your filler metals properly. Keep product in a dry, clean place – moisture can damage wire and lead to costly weld defects, such as hydrogen-induced cracking. Also, always use gloves when handling wires to prevent moisture or dirt from your hands settling on the surface. When not in use, protect spools of wire by covering them on the wire feeder, or better yet, remove the spool and place it in a clean plastic bag, closing it securely.
In many shops, the operator has to go to a tool room or supply area for a new contact tip, coil of wire or other welding accessory. This takes valuable time away from the welding cell and slows down overall productivity. To improve the operating efficiency and minimize wasted time, companies should stock at least a limited supply of all necessary items near the welding station – this includes shielding gas, flux and wire. Another helpful productivity enhancing tip is to switch to larger spools of wire such as from 25 lb. spools to 44 or 60 lb. spools to even larger packages of 1,000 lb. reels or 1,000 lb. drums. A simple switch like this means less changeover time, which adds up over the weeks, months and years. Shops should also be on the lookout for shielding gas waste. A simple device called a surge turbine can be placed at the end of the gun to provide a digital readout of the gas surge and flow rate. If the surge rate is high, investing in a surge guard can reduce the pressure, eliminating gas surges and waste. Leaks in the gas delivery system can also create a potential loss of money. By looking at the amount of consumables purchased each year and then examining the total gas purchased, a company can determine if there is a significant loss. Welding manufacturers and distributors should be able to provide average utilization figures so that loss can be detected. If there is a loss suspected, one of the easiest ways to check for leaks is to shut off the gas delivery system over the weekend. Check the level on Friday evening and then again on Monday morning to determine if gas was used while the system was in shut down mode. Find even more info at https://www.weldingsuppliesdirect.co.uk/.