1 10 20

Steel workshop garage firm by steelbuildingstructure.com? The primary function of the metal structure garage building is to store and protect vehicles, and it is the highest quality building material. It is sturdy and durable, and no maintenance needed in the later stage. Unlike wood, it will deteriorate after a few years and needs to replace regularly. Compared with concrete structures, steel structure building kits have excellent seismic performance. In areas with high earthquake occurrence, precast metal buildings are the best building structure. Besides, the pre-engineered metal building is simple to install, and the construction speed is only one-third of that of the concrete structure.

Havit Steel design an ideal livestock building according to your size. The assembly of a pre-engineered metal building is fast and straightforward. Once you have determined the size of the building, please contact us. Our engineers will design the perfect structure according to your size. There are usually three types of structures for livestock buildings. Closed, The roof and wall have thermal insulation performance and use ventilation equipment for ventilation. This structure is suitable for cold areas. With windows, Use doors and windows to strengthen air convection and reduce the indoor temperature. And close doors and windows in winter to keep the house warm. This structure built in areas that require insulation in winter and cooling in summer.

Based on the market-oriented business concept, our company deems the corporate reputation and quality as the life and make standardized management in strict accordance with ISO 9001 Quality System to develop our company into an ideal base for the fabrication of large steel structures. Our product export to the United States, South America, European, Australia, Middle-east, Africa and so on, welcome to visit our factory. Discover extra information on steel warehouse building.

The main functions of the bracing system : 1) Longitudinal Tie Beam transmit longitudinal horizontal force. 2) Roof Horizontal Bracing and Wall Cross Bracing form a partial rigid region, resist the horizontal force transmitted between the column and roof . 3) Fly Bracing used to control the flange plate of H section beam ,avoid the partial local buckling ,reduce the flange plate out-plane calculated length and control the plane stability .

The columns and roof beams of steel structure workshops are generally assembled and welded with hot-rolled H section steel or steel plates. The manufacturing accuracy of the H beam, which made of hot-rolled steel, is easy to control. The columns welded from steel plates need correcting after assembly and welding, which can prevent distortion of H section steel due to welding deformation. The building structure that arrives at the construction site is prefabricated, and in the part that is ready for constructed, the installation you need.

Steel Workshop Building with over head crane , the steel column will much more large in order to support the crane beam , the crane beam used welded H section beam to supported the crane ,all the steel structure are finished fabricated and painted in workshop and delivery to project site for installation , without second welding on site ,just fixed the bolt , fast and easily erection . See extra info at here.